QXG always is your reliable alternative supplier.
Welcome to be our partners!

Fast delivery

Fast delivery

With complete raw material supply chain and expedited production slots available, QXG is dedicated to short lead time to 4-8 weeks.

Equipment Factory Display

Testing Equipment
Production Workshop
Dc resistance rapid detector

Dc resistance rapid detector

Insulation oil chromatographic detector

Insulation oil chromatographic detector

Insulation resistance detector

Insulation resistance detector

Lightning impact detector

Lightning impact detector

Reactor test equipment

Reactor test equipment

Trace moisture detector

Trace moisture detector

 CRGO Shearing Area

CRGO Shearing Area

Iron Core Staking Area

Iron Core Staking Area

Drying & Vacuum area

Drying & Vacuum area

Final Assembly Area

Final Assembly Area

Test Area

Test Area

Finished Product Storage Area

Finished Product Storage Area

Qualification
Certificate

With complete raw material supply chain and expedited production slots available, QXG is dedicated to short lead time to 4-8 weeks.

CE
CE
CUL
CUL
ISO
ISO
UL
UL

Quality Management Process

QXG ensures transformer quality through strict control of the whole production process
Before Production
During Production
After Production
Professional Designing

Professional Designing

Our technician teams are specialized in the IEEE, CSA, ANSI, DOE Standard. We provide the design according to the Standards and market usage habit as well as your specific requirements to satisfy you.
Raw Materials Inspection

Raw Materials Inspection

We only use high quality raw materials and well-known brand accessories, such as Cooper, Qualitrol, Chardon...
Strict quality control

Strict quality control

QXG uses high-quality raw materials and accessories. We have strict quality control from raw material quality inspection - production quality inspection - production completion quality inspection. In addition, we also support video online quality inspection, third-party testing, CSA labeling and other services to ensure that the products sent to customers are perfect.
4-6 weeks lead time

4-6 weeks lead time

We have advanced production management system and sufficient production capacity to ensure that your order is completed in the shortest possible time.
Arrival follow-up stage

Arrival follow-up stage

Guide installation and use after delivery, and follow up the use of the project
Customers keep in touch

Customers keep in touch

Regular return visit, timely solve customer consultation problems, etc
Strict Quality Control

Strict Quality Control

We have strict quality control in our transformer factory. From raw material production to transformer manufacturing, all steps are accurately controlled. Our inspection team strictly reviews every transformer to ensure optimal product performance. We know the importance of each transformer which have to normally operate. With a high sense of responsibility, QXG contributes to the power industry to let every customer rest assured.

Global Service Network

Our technician teams are specialized in the IEEE, CSA, ANSI, DOE Standard. We provide the design according to the Standards and market usage habit as well as your specific requirements to satisfy you.
Global Service Network
TYPE TO SEARCH