We have UL and CUL certifications, which attest to the safety and quality of our products, especially for the North American market. We also hold CE, ISO, and other reliable certificates.
Generally, for standard transformers, we can finish production within 4 to 8 weeks, the ideal delivery time (contains shipping) could be 12 weeks. The actual delivery time depends on the complexity and quantity of the order, and the location of receiver.
We offer a two-year warranty on all transformers. During this period, if you encounter any problems related to product quality and installation, our team will actively cooperate with inspection, repair and provide online and offline installation services.
The primary voltage should match the local power grid voltage, usually 12 – 36 kV. The secondary voltage needs to meet the operating voltage requirements of mining equipment, such as 380V, 415V, 480V, etc. The conversion efficiency should be high, generally ≥95%, and the output voltage accuracy should be within
Yes, we provide professional OEM services. Whether you have a unique design concept or specific performance requirements, our team is ready to work with you. We can manufacture transformers according to your specifications, including customizing the appearance, performance parameters, and packaging.