Project Overview
QXG customized a batch of 1500 kVA ANSI-standard three-phase pad-mounted transformers for a photovoltaic park in the United States. Adopting a 34.5 kV high-voltage loop-feed architecture filled with FR3 eco-friendly insulating fluid and equipped with fully insulated Deadfront high-voltage bushings, the transformers supply highly safe and redundant grid-tied power for the park’s PV inverters, gas generator sets, energy storage systems and factory production loads.
The local area features a desert high-temperature climate with sustained extreme heat in summer, sharp day-night fluctuations in PV output, and prominent harmonic surges from gas generator operation. The underground distribution network of the park adopts a unified loop-feed power supply mode. Adjacent to an ecological reserve, the site is subject to stringent fire protection and environmental control standards. Conventional radial mineral oil transformers lack dual-circuit redundancy and fail to meet fire safety and environmental requirements, making them ineligible for grid interconnection and long-term high-temperature operation.
Project Challenges
- The utility mandates a loop-feed structure to realize dual-circuit power redundancy, while standard radial transformers cannot satisfy grid access specifications.
- Strict on-site environmental and fire codes mandate the use of biodegradable FR3 natural ester insulating fluid, prohibiting mineral oil-filled equipment.
- Long-term outdoor high-temperature conditions, coupled with frequent impact loads from PV and gas generation units, impose rigorous requirements on temperature rise and operational stability.
- Fully insulated construction without exposed live parts is compulsory for public outdoor areas, alongside complete monitoring and alarm devices to support unattended operation.
- Tight grid interconnection schedule requires full ANSI compliance, mass production and fast delivery.
To address all project constraints, QXG manufactured the transformers on mature ANSI-certified production lines with unified loop-feed Deadfront structure and FR3 fluid filling. A full set of factory acceptance tests were completed in one batch, and equipment was delivered on schedule to enable synchronous grid connection of the park’s renewable energy units.

Customized Solutions & Technical Advantages
- Loop-Feed Architecture to Meet US Utility Redundancy Requirements The high-voltage loop-feed design enables dual cable circuits to form a continuous network, ensuring uninterrupted power supply to loads during single-section line faults, consistent with mainstream underground distribution designs in the Southwestern US. Standard tap positions are configured to accommodate seasonal utility voltage fluctuations, and the 480Y/277 V low-voltage output caters to both three-phase power loads and single-phase lighting loads.
- FR3 Eco-Friendly Insulating Fluid Compliant with Local Fire and Ecological Regulations The units are filled with high-fire-point, biodegradable FR3 vegetable-based insulating fluid with superior thermal stability. Any fluid leakage will not contaminate soil or water, fully complying with the park’s mandatory environmental and fire protection rules.
- Stable Temperature Rise Design Adapted to Fluctuating High-Temperature Load Conditions Designed for a 65°C temperature rise with standard impedance to suppress short-circuit surges, the core and windings feature optimized harmonic suppression structures. The transformers can withstand long-term fluctuating loads from PV peak generation and generator startup/shutdown cycles. The natural cooling design eliminates cooling fan maintenance, ideal for unattended outdoor deployment.
- Integrated Full-Suite Monitoring Components for Convenient Remote Operation & Maintenance Each transformer is equipped with a complete set of monitoring accessories including liquid temperature gauge, liquid level gauge, alarm-contacted pressure relief device, pressure-vacuum gauge, drain valve with sampling port and Schrader charging valve. All alarm signals can be connected to the park’s remote monitoring system to realize early fault warning and routine oil sampling maintenance.
Project Outcomes
The batch of 1500 kVA loop-feed FR3 pad-mounted transformers successfully passed utility grid interconnection inspection as well as environmental and fire compliance audits, supporting stable long-term grid-connected operation of PV and gas generation units. The equipment operates smoothly under extreme summer high temperatures, and the redundant loop-feed power supply significantly reduces power outage risks.